i can weld ...
the one i have was a big fire extinguisher on wheels like a 12-15 gallon
then u love me
1 u need to make a drain with a valve
2 u need to get one of these
http://www.milehidistilling.com/heater-element-with-thermostat-1500w-115v/
u will need a coupler and to drill the hole in the side to mount it ........TIG not mig TIG will not rust
now insulate the shell this will make running it faster plus can have sitting anywhere (think waterheater)
3 the still head if u set it up so u can unscrew a cap to allow u to add fresh mash ....before u do u turn it off drain the spent stuff out and then add fresh cap turn back on
4 this works for a thumper too
here is the trick to it the heat u turn it to 5 and let set until the whole system heats up then turn it to 7 ...7 and half
then let her run use the parrot with tester to keep a eye on the abv when it gets down to 30% stop collecting and change the mash out for fresh stuff
a run should take u about hour to heat up 4 hours to run 10 gallons with 2 gallons in thumper 20 mins to refill system once u have it down .........the hose for the hot mash is important u get a good one so do not burn self or spill all over the place u are talking scolding temps 180 plus
as for the running i am assuming u done it so know how not to kill ppl ..........the rest of it is stuff i picked up to make the work easier for one man