feel kinda stupid saying this cause to most of you on here this is beginner shit, but i'm just kinda excited, did a lot of work on the room today. Been having a lot of stupid hang ups, the room itself just needs a door with lock put on. install shelf for ballast and pumps, bout half hour work to complete my gfci outlet, and one more section of intake hose connected. figure i'll be done with this within week then I can FINNALLY start.
things I have learned.-----
I hate working with mylar, its paint next time.
working in a confined space under stairs is a pain in the ass.
since the seal between filter and fan is so important, next time screw metal ducting, I found plumbing rubber connectors work great (picture tony the tiger saying that).
I am to picky, actually I hope this pays off.
and lastly, it seems no matter how well I think I have thought this all out, there seems to always be one more thing I need.
wish me luck in a week.