Heck yeah super busy, most of the irrigation got here, getting ready to frame up the exhaust fan. Wired up the speed control, and timer for the duct fan for the south furnace, ran wiring to the south shed, cut more cement board for the furnaces, rigged the steel floor framing that came with...