Is this plant behind schedule.(25 days old)

Way behind the power curve because of your medium. Light, airy, fluffy and well draining is key to root development.
If you keep in that medium, I'll kiss your ass and bark like a fox if you get 7 grams. Not giving you a hard time, just my
never to be humble opinion. This auto is 32 days old.
 

Attachments

  • IMG_20201109_114806520.jpg
    IMG_20201109_114806520.jpg
    7.1 MB · Views: 56
Way behind the power curve because of your medium. Light, airy, fluffy and well draining is key to root development.
If you keep in that medium, I'll kiss your ass and bark like a fox if you get 7 grams. Not giving you a hard time, just my
never to be humble opinion. This auto is 32 days old.
Lol. Ok thanks I just bought some actual quality medium this was the first plant I ever grew so I'm not too worried.
 
Really that's it?

If it truly is an autoflower, you lost a lot of precious time you can’t get back, with a photo you can Veg as long as you want and recover from serious time issues. I’d get some soil right away. Even transplanting has its own set of problems with autos, but keeping it in that soil won’t help.
 
If it truly is an autoflower, you lost a lot of precious time you can’t get back, with a photo you can Veg as long as you want and recover from serious time issues. I’d get some soil right away. Even transplanting has its own set of problems with autos, but keeping it in that soil won’t help.
Thank you I won't try to grow in that kind of medium again.
 
Yeah this is a different plant but Im too poor to buy good dirt for all of them so I'm just gonna use it on the new sprouts lol.
Hmm, can you find perlite? Conditioning the soil will help. Perlite was on a shortage up here this summer, even if you get a little cheap bag and make some small pots until you can get some decent mix and transplant. Would buy you a couple weeks and have healthier plants. Cheapest way I can think of.
 
Hmm, can you find perlite? Conditioning the soil will help. Perlite was on a shortage up here this summer, even if you get a little cheap bag and make some small pots until you can get some decent mix and transplant. Would buy you a couple weeks and have healthier plants. Cheapest way I can think of.
Thanks I appreciate it.
 
This autoflower is 25 days old and it seems really small to me?Will this plant amount to anything.

Here are my 3 that I have going, all autos. This is from this morning, Moby dick is 27 days, Purple Lemonade is 26 days, and Green Crack is 25 days. Green crack was my runt and now is filling out.
 

Attachments

  • 20201126_062030.jpg
    20201126_062030.jpg
    1.1 MB · Views: 17
  • 20201126_062015.jpg
    20201126_062015.jpg
    2.3 MB · Views: 18
  • 20201126_061705.jpg
    20201126_061705.jpg
    3 MB · Views: 23
  • 20201126_061700.jpg
    20201126_061700.jpg
    3.5 MB · Views: 23
Back
Top