Hi all,
For those that know me, you'll know that ive been growing for a long while in tents but have just moved into a new house that has a nice loft so decided to get a room built up there. Thought I would share it with you all
Materials Purchased:
Wickes:
Treated Regular C16 45mmx145mmx3m - x10 = £85.20
Sawn Treated Softwood 19x32mmx2.4m - x8 = £9.03
Studwork Timber 38x63mmx2.4m - x8 = £20.80
Plugless Frame Fixers 8x100mm 4pk = £3.62
Easy Drive Screws 4mmx60mm 100pk = £7.85
Grade P5 Chipboard ME Flr 2400x600x18mm x10 = £88.80
B n Q:
6 Rolls of Loft Insulation 100mm - £18.00 (Gonna do 2 layers on the outside of the triangle so that will be 200mm
10 x MDF Boards £102.80 (For inside triangle wall)
1 x 2 Section Loft Ladder £45.98
Total Spent so far is: £382.08
Its still a work in progress that needs to be finished by Easter as Im back to work after that.... finished the flooring, insulation up, walls up, loft ladder in and started on the frame for the entrance door today.
Inside is going to have BnQ Foil Insulation on top of the board so that will give me that + 200mm insulation on the outside.
Enjoy the pics
For those that know me, you'll know that ive been growing for a long while in tents but have just moved into a new house that has a nice loft so decided to get a room built up there. Thought I would share it with you all
Materials Purchased:
Wickes:
Treated Regular C16 45mmx145mmx3m - x10 = £85.20
Sawn Treated Softwood 19x32mmx2.4m - x8 = £9.03
Studwork Timber 38x63mmx2.4m - x8 = £20.80
Plugless Frame Fixers 8x100mm 4pk = £3.62
Easy Drive Screws 4mmx60mm 100pk = £7.85
Grade P5 Chipboard ME Flr 2400x600x18mm x10 = £88.80
B n Q:
6 Rolls of Loft Insulation 100mm - £18.00 (Gonna do 2 layers on the outside of the triangle so that will be 200mm
10 x MDF Boards £102.80 (For inside triangle wall)
1 x 2 Section Loft Ladder £45.98
Total Spent so far is: £382.08
Its still a work in progress that needs to be finished by Easter as Im back to work after that.... finished the flooring, insulation up, walls up, loft ladder in and started on the frame for the entrance door today.
Inside is going to have BnQ Foil Insulation on top of the board so that will give me that + 200mm insulation on the outside.
Enjoy the pics
Attachments
-
74.5 KB Views: 125
-
36.3 KB Views: 89
-
56.8 KB Views: 85
-
49.9 KB Views: 85
-
32.6 KB Views: 82
-
56.2 KB Views: 82
-
66.2 KB Views: 77
-
62.3 KB Views: 74
-
66.4 KB Views: 77
-
60.8 KB Views: 79
-
68.8 KB Views: 80
-
83.6 KB Views: 88
-
40.3 KB Views: 87
-
36.1 KB Views: 93
-
22 KB Views: 98
-
33.6 KB Views: 129
-
34.7 KB Views: 101