new to this thing, so plz have patience w me.

ruup4travling

New Member
ok heres the deal, I'm getting ready 2 move forward w my green thumb. heres the deal w not getting to descriptive. I have 3 xtra bedrooms that (1) is 12 x15 & (2) that are 10 x 10, all have 9 foot ceilings. being in (electrical) construction. I have numerous 1000w, 400w, hps, a ton of 4 foot, 4 lamp t-5s, w brand new assorted colored lamps, led incl., and construction LED (high wattage, white) lights, 3 brand new electronic time clocks, and (2) 110v good sized blower fans used in man holes. I've started constructing 1 of the 10' x 10'
rooms in unistrut, to accommodate the 9' ceilings and offer more stability. I've built it 4 ft x 8 ft to accommodate 4'x8' sheets of plywood. I also have access to charcole filters/exhaust fans, water purifier. &
possibly anything I need. money is no problem. water + electricity are located right next to the room. any and all suggestions would be appriciated. ty in advance
 
Top