theloadeddragon
Well-Known Member
Im starting this now because of the immense amount of prep work that is going into it.
I am finally getting a permanent outdoor set up established. I have designed a greenhouse to go in this area.
First I have to take apart the raised beds that are already there and cut down this nasty oak tree.
Then take down the fence and move it farther back to the very edge of the clearing.
Then take out the huge red bud that is in the way and remove its stump.
Then I can level the area for the greenhouse which will involve painstakingly removing huge chunks of granite.
Then I can actually build the greenhouse.
Then I can tear the shit out of the local soil thats there, clean it, leech the shit out of it, and ammend the soil.
Then I can install raised beds to my specifications, including support lines.
Then I can top some nearby trees to maximize sun exposure.
Then I can finally put plants in there.
I am hoping to do a test run starting in the middle of Oct. So I need to do all this in the next month and a half.
Things will change..... I never get to go by my plan, just as close to it as possible. For some reason Im depressed......
I will take pics of the process as best as I can.
I am finally getting a permanent outdoor set up established. I have designed a greenhouse to go in this area.
First I have to take apart the raised beds that are already there and cut down this nasty oak tree.
Then take down the fence and move it farther back to the very edge of the clearing.
Then take out the huge red bud that is in the way and remove its stump.
Then I can level the area for the greenhouse which will involve painstakingly removing huge chunks of granite.
Then I can actually build the greenhouse.
Then I can tear the shit out of the local soil thats there, clean it, leech the shit out of it, and ammend the soil.
Then I can install raised beds to my specifications, including support lines.
Then I can top some nearby trees to maximize sun exposure.
Then I can finally put plants in there.
I am hoping to do a test run starting in the middle of Oct. So I need to do all this in the next month and a half.
Things will change..... I never get to go by my plan, just as close to it as possible. For some reason Im depressed......
I will take pics of the process as best as I can.
Attachments
-
128.6 KB Views: 1,070
-
121.2 KB Views: 892
-
87.8 KB Views: 798
-
98.8 KB Views: 989
-
96.3 KB Views: 723
-
118.7 KB Views: 745
-
112 KB Views: 748