Doing some of the work myself. Thankfully it's a walk out. The cement cutting someone else is doing. I also have a roughly 6' x 8' x 4' cistern that was the original water system. It's about 8" thick and solid. The only thing I need to demo next is the grow area.....trying to figure out where that's all going. Then I can take out the stairs and utilities.....move out and get the drainage in. I'm going to be doing all or at least most of the finish work but I might push that back because of the prices of building materials.
Those old cisterns were amazing. One of the houses I'm selling has an old brick one under the kitchen addition, that is about half filled in with dirt. I'm sure it held their water supply before city water was available. The house was built late 1800's early 1900's.

Yeah if you can just get the drainage and concrete work done this year and hopefully building material prices come down some in the future!!
 