Guys!! What a busy day at work! I've been all over the city. We got the keys for our new club last week and the workers are moving fast. We have certain requirements to maintain including air extraction so the street doesnt stink of weed. Plus we've installed a partition wall for the security at the front. Plumbing for the bar and toilets etc.
This is the aluminium tubing for the air extraction. We'll be using 3 carbon filters.
Shops here are not always that big but we needed lots of space
Separate connectors for the filters to attach.
This was a stroke of luck. Air out!
Check out the size of my boots- looks like I'm goin for a walk on the moon!!
Then things got really interesting for me as I caught up with my columbian friends at their club. One just returned from 2 mths travelling and I'm going to a new club that opened , with him to meet the owners.
Def gonna take pics tomorrow as he said the rent is €9,000 a month!! It better look great!
This club is really private. U need a rec to join, u can't just walk into this one. I want to go to Resin club also but it depends on him. He's got 15 strains of mums so we're swapping those tomorrow too! Oh boy!