Good afternoon.
Room will be 12 x 5' x 7' tall. Running 3k hps air cooled hoods.
240v current will run the system. Currently the room is wired for 120.
The first question is: would it be better to run 240 into its own terminal circuit breaker box and then into a four light terminal such as a blueprint hub 4 or similar operated by a heavy duty wall timer?
Or run the 240 into a Helios - 9 or similar which would essentially be a 4 lamp controller with circuit breaker and timer built right into the unit.
Second question is would two 6" exhaust fans connected to carbon filters be enough to vent the room. One 6" inline also will be dedicated to vent the hoods via the same timer as if it was the fourth light on the Helios 9. The fans are all 392 cfm. Two for room exhaust and one for the lamps.
Budget is on the high end, wiring will be professional.
Room will be 12 x 5' x 7' tall. Running 3k hps air cooled hoods.
240v current will run the system. Currently the room is wired for 120.
The first question is: would it be better to run 240 into its own terminal circuit breaker box and then into a four light terminal such as a blueprint hub 4 or similar operated by a heavy duty wall timer?
Or run the 240 into a Helios - 9 or similar which would essentially be a 4 lamp controller with circuit breaker and timer built right into the unit.
Second question is would two 6" exhaust fans connected to carbon filters be enough to vent the room. One 6" inline also will be dedicated to vent the hoods via the same timer as if it was the fourth light on the Helios 9. The fans are all 392 cfm. Two for room exhaust and one for the lamps.
Budget is on the high end, wiring will be professional.