majins
Well-Known Member
So just finished planing the rest of my room and thought it was time to do a write up.
First off
Budget:
Water cooling parts for LEDs come out to about $200 USD
Parts for the RDWC:
Mostly had other then 1 extra bucket, some pipe a pump and fittings.
Come out at $100USD but bought it locally so dont have screen shot of parts.
Already have the LEDs so the only extra price there is going to be to extend some wiring and make brackets to attach to water blocks.
4X CREE 3070
1X Citi 058-1825
Safety:
Ontop of fuses and breakers have the LED drivers AC wire up to a relay which requires the water pumps RPM to be higher then 800rpm to trigger on.
$8 worth of parts
--------
Room layout:
Pictures sort of explain everything.
Main thing is the water cooling is there so heat can be remove straight out the exhaust in summer, Then dumped back in the room during winter.
Return to res bucket will be raised to the height I want to maintain the other buckets at which will be about half way. This will also make flushing and draining easier and allow me to run lower total volume while they arnt drinking too much to save on total nutes used.
Middle LED Citi 058-1825 ran @ 257W will remain off during veg.
Plants will be trained towards the middle. 2 sets of toppings and 4 weeks veg should achieve good coverage.
---
First parts are starting to arrive but as you can see on the Ebay parts list some have a bit of a wait.
Next proper update will be when I have all the parts but feel free to ask and questions or point out any where I can improve on my room setup.
First off
Budget:
Water cooling parts for LEDs come out to about $200 USD
Parts for the RDWC:
Mostly had other then 1 extra bucket, some pipe a pump and fittings.
Come out at $100USD but bought it locally so dont have screen shot of parts.
Already have the LEDs so the only extra price there is going to be to extend some wiring and make brackets to attach to water blocks.
4X CREE 3070
1X Citi 058-1825
Safety:
Ontop of fuses and breakers have the LED drivers AC wire up to a relay which requires the water pumps RPM to be higher then 800rpm to trigger on.
$8 worth of parts
--------
Room layout:
Pictures sort of explain everything.
Main thing is the water cooling is there so heat can be remove straight out the exhaust in summer, Then dumped back in the room during winter.
Return to res bucket will be raised to the height I want to maintain the other buckets at which will be about half way. This will also make flushing and draining easier and allow me to run lower total volume while they arnt drinking too much to save on total nutes used.
Middle LED Citi 058-1825 ran @ 257W will remain off during veg.
Plants will be trained towards the middle. 2 sets of toppings and 4 weeks veg should achieve good coverage.
---
First parts are starting to arrive but as you can see on the Ebay parts list some have a bit of a wait.
Next proper update will be when I have all the parts but feel free to ask and questions or point out any where I can improve on my room setup.