Looks like 4 big guys. Probably could put like 6 woman on that thing. Sick! Hope things motor is ready for yall!!
Only room for 2 bigs branches at a time tho ?
If yer look closely two are waiting to go in as the other 2 finish...
What it needs is a 6 ft table 60 cm width with 4 fans/choppers/blade sets and one 2 motors running one each end to operate 2 units.
With 4 ppl using at same time you could rotate two crews of 4 ppl....4 ppl out in field cutting branches down for 3 hrs and then swapping with the crew at the table for 3 hrs with a 30 min break on changeover to recharge and go again.
Dont thank me jj im just an ideas man and leg soldier...someone else can build it lol