WeedFreak78
Well-Known Member
I'm throwing together a couple last minute drip system so I can go away for a few days. Would like some opinions to see if there's any problems I overlooked. It's all soil, so I'm just running ro water.
First system is going to have a 400 gph pond pump in an insulated 18 gal tote, run out through a 1/2" pvc riser, 90deg, to 1/2" blk tubing, appx 6', that's going to Tee to out to two 1/2" feeder lines, appx 8', that will each end in a 6 port drip manifold on a 18" pvc riser. Each manifold port will have a 1/4" line, appx 4', feeding a 2' coil of 1/4" drip line in a single bucket.
Second system will be run directly off my ro tank and pump, something like 1200gph?, feeding another 6 port manifold. I have more than 6 i need to water, so I'm going to daisy chain a complete circuit of 1/4" drip line, unknown length...15'?.. around them, with 6 Tees inline, all fed from the manifold, appx 6' each of 1/4" line. Should create a fairy even flow across the system right?
All systems will be balanced as close as possible, same length feeder lines, drip rings, risers, etc.
I just need to figure out what it's actually going to flow and my timer settings..... And get it built and dialed in within the next, oh, 20 hrs? No prob....
First system is going to have a 400 gph pond pump in an insulated 18 gal tote, run out through a 1/2" pvc riser, 90deg, to 1/2" blk tubing, appx 6', that's going to Tee to out to two 1/2" feeder lines, appx 8', that will each end in a 6 port drip manifold on a 18" pvc riser. Each manifold port will have a 1/4" line, appx 4', feeding a 2' coil of 1/4" drip line in a single bucket.
Second system will be run directly off my ro tank and pump, something like 1200gph?, feeding another 6 port manifold. I have more than 6 i need to water, so I'm going to daisy chain a complete circuit of 1/4" drip line, unknown length...15'?.. around them, with 6 Tees inline, all fed from the manifold, appx 6' each of 1/4" line. Should create a fairy even flow across the system right?
All systems will be balanced as close as possible, same length feeder lines, drip rings, risers, etc.
I just need to figure out what it's actually going to flow and my timer settings..... And get it built and dialed in within the next, oh, 20 hrs? No prob....