I dry in my flowering room since its humidity/temp/smell controlled -I use a premade plastic storage unit with large drawers, inside each drawer is a metal rack/screen typically used for cooking, they stack on top of each other I fit 3 racks per drawer, 1 drawer holds roughly a plant - the whole thing is on the concrete floor and its the room is about 65-75F with my humidity controlled at around 35% or 40% it takes 10 to 14 days to dry here then I go to jars to cure, the smoke is already smooth at this point before the cure even begins since it was dyed so slow.