How much did that cost you?lots of info here, i just went through all this my self, but i did the smart thing hired an electrician! now i have a brand new 200amp panel that feeds right off my meter instead of tapping into my house panel.
looks good-
like marty said balance the load across the poles. look like you just need some two pole breakers and youre good. one benefit of running 240 is it splits the load across two poles instead of one. so 10 amps at 120 V across one wire, or 10 amps at 240 across TWO(2) wires. resulting in five amps on a conductor instead of ten. meaning? way less wire. 12 gauge is WAY cheaper than 8.
good job, man!