[FONT="]I am in the process of planning my first grow in my new place and needed some help with the electrical aspect of things. My setup will consists of 4x600watts lights, I estimate 6-8 pumps, 2-8 vortex fans, 2 oscillating fans, around 250w of HO lighting, 10,000btu a/c, dehumidifier, c02, environment controller, timers, ect. [/FONT]
[FONT="]
Anyways, this will be a basement grow and I need a way to bring power to my basement. I contacted a local electrician and we quoted me around $600 for materials and labor to install a sub panel in my basement. I told him that I wanted 40-50amps wired up in my sub panel and the distance I want the sub panel is about 60' from my main panel and 1 floor below. Does his estimate sounds about right, honestly sounded a little cheap to me. Was expecting it to be more $$$$.[/FONT]
[FONT="]
Now my questions are as followed [/FONT]
[FONT="]
1.[/FONT][FONT="]What do I tell him if he asked what I need the panel for? I was planning to say that I wanted to finish my basement at a later date or possibly add a second kitchen/living room or maybe a home theater room. [/FONT]
[FONT="]
2.[/FONT][FONT="]I am planning to run (4)240 ballast but everything else will be 120v. How should I tell him to wire the panel up? What size breakers and how many of each. [/FONT]
[FONT="]
3.[/FONT][FONT="]Also, are there any certain brands or wire gauges I should ask for before the install? I want to make sure he's not cutting corners running cheap higher gauge wires.[/FONT]
[FONT="]
Thanks for all the help guys cant wait to get this up and running.[/FONT]
[FONT="]
Anyways, this will be a basement grow and I need a way to bring power to my basement. I contacted a local electrician and we quoted me around $600 for materials and labor to install a sub panel in my basement. I told him that I wanted 40-50amps wired up in my sub panel and the distance I want the sub panel is about 60' from my main panel and 1 floor below. Does his estimate sounds about right, honestly sounded a little cheap to me. Was expecting it to be more $$$$.[/FONT]
[FONT="]
Now my questions are as followed [/FONT]
[FONT="]
1.[/FONT][FONT="]What do I tell him if he asked what I need the panel for? I was planning to say that I wanted to finish my basement at a later date or possibly add a second kitchen/living room or maybe a home theater room. [/FONT]
[FONT="]
2.[/FONT][FONT="]I am planning to run (4)240 ballast but everything else will be 120v. How should I tell him to wire the panel up? What size breakers and how many of each. [/FONT]
[FONT="]
3.[/FONT][FONT="]Also, are there any certain brands or wire gauges I should ask for before the install? I want to make sure he's not cutting corners running cheap higher gauge wires.[/FONT]
[FONT="]
Thanks for all the help guys cant wait to get this up and running.[/FONT]