509Rebel
Member
I have a Critical Mass currently on day 59 of flowering. Everything I've read on flowering time for Critical Mass says it's 7-8 week flower. Now into the 9th week, the trichomes are still an immature clear, short and few in numbers. And look at the pistils! She looks more like she's in like week 4 I think. At any rate, I would like to know what causes late development like this. I wasn't aware that it could indeed take plants significantly longer to flower than typical.
In the same room I have a Blue Dream which is a 10 week flower, and it seems to be flowering at a more typical pace. More of it's pistils have turned, it has more developed trichs, and has many more of them than the CM.
Using Black Gold Waterhold Cocoblend in a 17gal storage tote drilled for drainage.
Happy Frog All-Purpose fert: light recommended dose about 30 days ago.
(2x) 1000w Hortilux multi spectrum HPS
Used 12/12 lighting but stepped down an hour at a time to arrive at 10/14 in effort to hurry the CM to finish.
Any ideas???
Sent from my LG-D801 using Rollitup mobile app
In the same room I have a Blue Dream which is a 10 week flower, and it seems to be flowering at a more typical pace. More of it's pistils have turned, it has more developed trichs, and has many more of them than the CM.
Using Black Gold Waterhold Cocoblend in a 17gal storage tote drilled for drainage.
Happy Frog All-Purpose fert: light recommended dose about 30 days ago.
(2x) 1000w Hortilux multi spectrum HPS
Used 12/12 lighting but stepped down an hour at a time to arrive at 10/14 in effort to hurry the CM to finish.
Any ideas???
Sent from my LG-D801 using Rollitup mobile app