BoomerBloomer57
Well-Known Member
Was sitting with my Redheaded hottie and got to discussing yet another lab.
And thats when the fight began,,,,,,
Naw, not really. Dead space that needs to be put to use. And keep me out of trouble.
Putting my list together. Start date 1st week of feb for the build.
I'm gonna trick this bitch out.
From scratch.
DWC/SCROG
Basement with limited height.
Have to put up some 2 inch insulation.
Exhaust fans.
Wall fans.
2 120 qt Igloos.
2 110 liter per hr air pumps.
2 Lumatek dimable Ballast 1000 wt.
2 ea SunMaster HPS and MH bulbs.
6 inch airstones.
A/C.
Heater.
1 Intelidrive Light rail with trolley, run two lights with one mover.
30 days to plan it, clean it out and get it ready for the build.
And thats when the fight began,,,,,,
Naw, not really. Dead space that needs to be put to use. And keep me out of trouble.
Putting my list together. Start date 1st week of feb for the build.
I'm gonna trick this bitch out.
From scratch.
DWC/SCROG
Basement with limited height.
Have to put up some 2 inch insulation.
Exhaust fans.
Wall fans.
2 120 qt Igloos.
2 110 liter per hr air pumps.
2 Lumatek dimable Ballast 1000 wt.
2 ea SunMaster HPS and MH bulbs.
6 inch airstones.
A/C.
Heater.
1 Intelidrive Light rail with trolley, run two lights with one mover.
30 days to plan it, clean it out and get it ready for the build.
Attachments
-
77.1 KB Views: 60
-
57.3 KB Views: 52