TreeFarmerCharlie
Well-Known Member
It looks like you drilled some holes through traces. Why are you using so many screws to hold those to the frame?
I've never done this before. How should I be doing it?It looks like you drilled some holes through traces. Why are you using so many screws to hold those to the frame?
Just use the supplied holes and plastic washers prevent shorting. You could also just use double sided thermal tape to attach them to the frame.I've never done this before. How should I be doing it?