So like today I didnt have any bracket material so I put that project on hold and thought I would finish plumbing the r/o to a res. When I went out there I noticed water on the ground by the drain line. Yep the drain line was still going. WTF it stopped before, like three days ago. Fuck that means I been dripping water at about 5 gal an hour for three days, that's like 360 gallons. Either the shut-off valve I have on the thing failed or it never worked at all. I ordered a check valve and a shut-off valve online for $20 delivered.
I layed out the 200 feet of 1/4 inch feed line along the fence to where the res is gonna go but Max got to it and chewed it up in a few places before I could bury it. Oh well, my bad. dogs will be dogs. If I cant find all the holes and repair it I will get some new line.
Hes getting better, he understands Sit, Stay and Easy but he doesnt understand "dont chew the fuckin waterline"
I layed out the 200 feet of 1/4 inch feed line along the fence to where the res is gonna go but Max got to it and chewed it up in a few places before I could bury it. Oh well, my bad. dogs will be dogs. If I cant find all the holes and repair it I will get some new line.
Hes getting better, he understands Sit, Stay and Easy but he doesnt understand "dont chew the fuckin waterline"
This was taken last night. The flash made his eyes green.
He's filling out, gained 5 pounds the last couple weeks.
He's filling out, gained 5 pounds the last couple weeks.