I'm preparing to build 60x60 prefab building/grow. So I can choose my new service. I want to educate myself more before calling electric company.
Now let me say I've always done my own wiring. It's not rocket science. Anyways, I was planning on running 32kw for now. So I could just do a basic 200 amp service but that would mean two separate flower rooms and worries. So I'm looking into 208/230 and 240/480 or 220/440. But I'm not knowledgable. enough all by myself at this point to do so.
I imagine it comes in at say 220. A double pole would give me 440 and a transformer would be needed to step it down to 110?
I'm ready to be schooled.... anyone?
Now let me say I've always done my own wiring. It's not rocket science. Anyways, I was planning on running 32kw for now. So I could just do a basic 200 amp service but that would mean two separate flower rooms and worries. So I'm looking into 208/230 and 240/480 or 220/440. But I'm not knowledgable. enough all by myself at this point to do so.
I imagine it comes in at say 220. A double pole would give me 440 and a transformer would be needed to step it down to 110?
I'm ready to be schooled.... anyone?