jordanwh
Member
37 days from seed. Got tired of looking at the half assed scrog net, I couldn’t stretch it tight enough like I thought and scrapped it. Building a pvc frame tomorrow to get a good tight stretch on the netting. In the meantime I bought pipe cleaners and I’m doing some LST and defoliated to open up the inner nodes.
Attachments
-
5.5 MB Views: 9
-
6 MB Views: 10
-
2.7 MB Views: 9