stelthy
Well-Known Member
Ok so we have the intake Odor Socs .. Do we have the intake elbow's ? if so Do the Odor Socs fit nicely onto the intake bends? (add a pic if thats cool ) We'll also need some jubilee clips to fit and hold the Socs in place and on the bends .. 1.5 mil sounds ok and you can always wrap silver tape around the elbow to increase the diameter/circumference before using the sealant to hold it in place. The Fatmat sounds goodYes i have the odour socks. As for the gap ive just checked and its 3mil so that will mean 1.5mm all the way round. What do you think?
Im gonna go with the fatmat i think as its one job lot.
I hadnt decided when to do the intake holes, maybe do the top first out of the way? The bottoms are finished now, 20 mtrs of mylar so far lol. We have tried to move the cabs but they are well heavy mate, could we get away with the 1" gap for the one cab as this would make my life alot easier.
Ill do each top cab one at a time which will be easier because even those are well heavy.
The 1" Gap on the left between the cab and the wall will reduce the air-flow.. However it will work, (just not as well)...How far away from the wall is the back of both the cabs? If there's more than a 1" Gap we could relocate the intakes to the back corners of each cab?!!
Its upto you which part of the mission we tackle 1st, it makes no difference in the end.. I would have started at the bottom just cos its easier, and you can use the tools with less effort ie stretching,leaning, bending etc. But in the end it makes no difference
Do you have the X4 Top Hats - for the top of the cabs...(the metal lip circles that the fan & bends will connect to) I will find a link to them and draw a pic to illustrate after I've had my dinner - STELTHY