REALSTYLES
Well-Known Member
35 minutes.........J/K depends on a few factors, are you gonna use cob holders or adhesive thermal paste or are you gonna use a big heat sink or a bunch of small ones. I made 2 panel in a course of a day with drilling and tapping. I'm much faster now and I have my design down the longest time will be drilling holes if you choose the cob holder route.I want the great DIY ones. How many man hours to build? Give or take. Full blast ones. I don't mind buying an a/c if needed.