partlycloudy
Well-Known Member
4 people were working at same time the pic just caught the middle of flipping a cola over. Only time other people had to wait is when someone had a 3 foot cola lolOnly room for 2 bigs branches at a time tho ?
If yer look closely two are waiting to go in as the other 2 finish...
What it needs is a 6 ft table 60 cm width with 4 fans/choppers/blade sets and one 2 motors running one each end to operate 2 units.
With 4 ppl using at same time you could rotate two crews of 4 ppl....4 ppl out in field cutting branches down for 3 hrs and then swapping with the crew at the table for 3 hrs with a 30 min break on changeover to recharge and go again.
Dont thank me jj im just an ideas man and leg soldier...someone else can build it lol
Sent from my VS985 4G using Rollitup mobile app