Got step one of the new tent set up done.
Using 2x4 of my tent for hempys that I’m hooking to a manifold and reservoir. Gonna make those later tonight or tomorrow depends how long this trim session takes. Probably going to put a couple DWC plants in the front half once my other 96’s get here.
I’ll have 4 96’s total and I’ll Be adding the last two mid summer to make it an even 6.
Any way I’ll be switching the buckets for a tray and then drilling new drain holes to run a 1/2” drain tube from the tubs into the tray/bucket. And the. I’ll be running 1/2” tubes from each halo ring to the manifold then to my reservoir. I’ll be adding on and off valves between my manifold and my Halo rings so I can control the water flow and water all three at once or one at a time.
View attachment 4324074 View attachment 4324075 View attachment 4324074 View attachment 4324076