What did you accomplish today?

Mitchician

Well-Known Member
Transplanted some plants in my mid-bloom-transplant experiment...

These are in week 2..

.20191217_001019.jpg


This one's in week 5 but looks like week 3, she took ages to start blooming...

20191217_003654.jpg


another in week 5ish...

20191217_005603.jpg


Left a couple sitting proud out of the new media.. going for that exposed root look...

20191217_011650.jpg20191217_011707.jpg


Cleaned up the seedling area..
Renewed my mothers and started a few seeds...

From the cloning bed dome experiment into some coco micro-sips...

20191217_104009.jpg20191217_112415.jpg
20191218_015456.jpg


..oh and I made a couple batches of fudge. Just standard old Vladimir on the left, vanilla and hemp seed on the right. I'm letting the teachers choose. I cut the hemp one in rectangles because if you choose the standard Russian you must be square.. or have an allergy to awesome..

20191218_011757.jpg

Good night all. It's fuckin' 3am.
 

Attachments

Roger A. Shrubber

Well-Known Member
woke up to quiet..too quiet....half of my power was off. turns out the main breaker outside under the meter went bad, and half the box wasn't getting any juice. took all of 5 minutes to fix....after my boss talked to his friends at the electric office. at first it was one of those "it'll be tomorrow" things, and then a "you need to have an inspector" thing....
we didn't need them at all, but since it was the main breaker, you can't get to it without taking the meter loose, and if you break the little security seal, they'll shit all over themselves, and try to splash you with as much of it as possible. so he had to talk to his buddy, then they sent a guy right over to take the meter off for us, and then reinstall it and put a new seal on it. they do have to come "inspect" the work, which can be read as "they have to come do nothing and charge us 50 bucks to do it"....but it's done, and the inspector is scheduled.
surprised the breaker lasted as long as it did, looks like shit inside
IMG_20191217_093211.jpg
 

curious2garden

Well-Known Mod
Staff member
Transplanted some plants in my mid-bloom-transplant experiment...

These are in week 2..

.View attachment 4438412


This one's in week 5 but looks like week 3, she took ages to start blooming...

View attachment 4438416


another in week 5ish...

View attachment 4438420


Left a couple sitting proud out of the new media.. going for that exposed root look...

View attachment 4438424View attachment 4438425


Cleaned up the seedling area..
Renewed my mothers and started a few seeds...

From the cloning bed dome experiment into some coco micro-sips...

View attachment 4438426View attachment 4438427
View attachment 4438428


..oh and I made a couple batches of fudge. Just standard old Vladimir on the left, vanilla and hemp seed on the right. I'm letting the teachers choose. I cut the hemp one in rectangles because if you choose the standard Russian you must be square.. or have an allergy to awesome..

View attachment 4438429

Good night all. It's fuckin' 3am.
What is Vladimir or was that a who?
 

curious2garden

Well-Known Mod
Staff member
woke up to quiet..too quiet....half of my power was off. turns out the main breaker outside under the meter went bad, and half the box wasn't getting any juice. took all of 5 minutes to fix....after my boss talked to his friends at the electric office. at first it was one of those "it'll be tomorrow" things, and then a "you need to have an inspector" thing....
we didn't need them at all, but since it was the main breaker, you can't get to it without taking the meter loose, and if you break the little security seal, they'll shit all over themselves, and try to splash you with as much of it as possible. so he had to talk to his buddy, then they sent a guy right over to take the meter off for us, and then reinstall it and put a new seal on it. they do have to come "inspect" the work, which can be read as "they have to come do nothing and charge us 50 bucks to do it"....but it's done, and the inspector is scheduled.
surprised the breaker lasted as long as it did, looks like shit inside
View attachment 4438443
I chose to stay on an analog meter when most of my state went digital. I'm sort of surprised that those who refrained from the 'upgrade' have not experienced similar meltdowns.
 

Roger A. Shrubber

Well-Known Member
I chose to stay on an analog meter when most of my state went digital. I'm sort of surprised that those who refrained from the 'upgrade' have not experienced similar meltdowns.
we did change to digital meters about 4 years ago, as far as i know they didn't ask us our preferences, but i'm a little out of the loop, my electric bill is paid as part of my salary for managing the apartments, and has been for 13 years now, so all my electric company info is second hand
 

curious2garden

Well-Known Mod
Staff member
we did change to digital meters about 4 years ago, as far as i know they didn't ask us our preferences, but i'm a little out of the loop, my electric bill is paid as part of my salary for managing the apartments, and has been for 13 years now, so all my electric company info is second hand
My quarrel with them is they have bidirectional communication.
 
Top