Should you cut off fan leaves during flower( a simple poll just yea or no please)

JakeBakeADK

Well-Known Member
Go spend time with your wife and kids dude. You’ve literally been online for almost 8 hours now
My biggest fan! I find it hard to take advice from a grown up in sweatpants tho I do appreciate your input:) love ya dude don’t be so salty. I take very very good care of my wife and kids:) I am actually blessed to have a very intellectually advanced 3 year old that requires almost all of my free time. (Hence why I let her help in the garden)
 

bk78

Well-Known Member
My biggest fan! I find it hard to take advice from a grown up in sweatpants tho I do appreciate your input:) love ya dude don’t be so salty. I take very very good care of my wife and kids:) I am actually blessed to have a very intellectually advanced 3 year old that requires almost all of my free time. (Hence why I let her help in the garden)
So was she helping you lie all day on RIU for the 8 hour shift you put in too?
 

JakeBakeADK

Well-Known Member
So was she helping you lie all day on RIU for the 8 hour shift you put in too?
I sub out and run my small laser screed for another company on days I’m not needed with my footing or wall guys. I work a lot of hours but I do have free time sometimes:)
 

Wattzzup

Well-Known Member
I get paid by the square foot on commercial slabs fool. If you were a concrete business owner you would know this and a lot more. I love all the advice from the little guys tho it’s sweet.
So if your paid by the sq ft, how do you fill those sq ft? YARDS of concrete probably huh? They charge you by the yard or the sq ft up there?
 

bk78

Well-Known Member
I sub out and run my small laser screed for another company on days I’m not needed with my footing or wall guys. I work a lot of hours but I do have free time sometimes:)
So you own 2 35 light grows, a concrete company, a bug infested shed and work for another company? But you literally spend a whole day arguing with other dudes on the internet?
 

JakeBakeADK

Well-Known Member
So if your paid by the sq ft, how do you fill those sq ft? YARDS of concrete probably huh? They charge you by the yard or the sq ft up there?
Usually the contractor on large jobs buys the concrete dummy…I place,finish and saw cut. I buy concrete and charge by the yard when I do footings and walls..that’s how you make money… not super complicated..or so I thought lol
 

Wattzzup

Well-Known Member
Usually the contractor on large jobs buys the concrete dummy…I place,finish and saw cut. I buy concrete and charge by the yard when I do footings and walls..that’s how you make money… not super complicated..or so I thought lol
I just told you we pour more in a day than you do in a week Our company buys the concrete not the contractor. Only the ones with bad credit have the contractor buy it.
 

JakeBakeADK

Well-Known Member
So you own 2 35 light grows, a concrete company, a bug infested shed and work for another company? But you literally spend a whole day arguing with other dudes on the internet?
Yes. I my wife and i also homeschool our daughter and our son when he is old enough. I will argue to the death with anyone as long as the truth is on my side. Not too many people agree with my way of life but it doesn’t matter to me I know the way I work,and the way I raise my kids is not the easy way but it’s the way I choose to do it.
 

JakeBakeADK

Well-Known Member
I just told you we pour more in a day than you do in a week Our company buys the concrete not the contractor. Only the ones with bad credit have the contractor buy it.
I don’t care how much you pour? Like at all lol. I poured 2200 yards last week but it was all big laser screed pours 40,000 sq ft wide open. Doesn’t get any easier. Wondering why you’re so into my concrete business lol
 

Wattzzup

Well-Known Member
Usually the contractor on large jobs buys the concrete dummy…I place,finish and saw cut. I buy concrete and charge by the yard when I do footings and walls..that’s how you make money… not super complicated..or so I thought lol
The way it really works on big jobs is that the concrete contractor bids the job concrete included. No one bids labor only unless you don’t have credit. That way you can corner cut the shit out of the job to save on concrete. But what I do I know. You’re the entrepreneur :roll:
 