laddyd
Well-Known Member
It's not that bad. You can rent an electric one.I've been wondering if it's possible to abandon all the old drain system and replace with pvc above the floor grade. I'm planning a new kitchen in 2 years and this needs to be solved as part of that project. Not anxious to jackhammer the floor up.