yeh gunna mount em both up top to the rafters the duct along betwen, keep it outa the way then up the stairs n out the celler door, gunna hang a curtain inside the celler door so nobody can see the light, i was gunna take a brik and duct outa the chiney stack, but i think that would be suss cummin outa the stack in this weather,
fuk me i go to feed i strip of and am dripping, should be a dryer heat now since i removed the old bags of rockwool the dude had down ther, fucking sodden wet, good job its gone dont need that much moisture, so, i need to rewire a light to the bit im using, then wire a plug in ther, paint the lot white, put a table n ther, put up 2 shelf brackets, mount the t4 ready for the cloner box underneath, got all the stones and attachments i need for the pump, i thiknk i got a tub sorted but lets see,
pgp thing, never used it or investigated it sambo,,
MG just waiting on clonex, be here tomoz, il have box knocked up for then too, chillax lol,, fuk me firstt time n all under pressure aye?
all sorted in my mind the only thing i cant work out is how deep do the bottoms of the cuts have to be in the bubbling water? just the tip or like a inch ? can imagine the water gets lower like