Blaze & Daze

Laughing Grass

Well-Known Member
Whoa! Are we related somehow? Were we possibly separated at birth?

Cause I detest both of those as well - and won't eat those even when extremely high.

As a kid it seemed that EVERY meal was liver and sprouts. Sprouts were jokingly nicknamed "stabbers" but the cute moniker didn't make them taste any better.
What is your thoughts on cabbage?

I used to stick food I didn't want to eat into the pedestal of the dining room table until they figured that out and blocked the holes.
 

StareCase

Well-Known Member
... What is your thoughts on cabbage? ...
And that's the weird part ... full grown cabbage is great in a coleslaw but as a stabber - no thanks.
... I used to stick food I didn't want to eat into the pedestal of the dining room table until they figured that out and blocked the holes ...
You little maverick you! That dining room must have been pretty stinky until your folks caught on?
 

Tvanmunhen

Well-Known Member
I think @shnkrmn is pretty experienced at this. He could probably offer a few pointers.
Thanks for the heads up! It shouldn't be too bad, the good news is I have plenty of time to work with the material. It's slow drying and is the consistency of pizza dough. I'm mainly insecure about making straight lines with the glazing tool and keeping everything all smooth.
 

StareCase

Well-Known Member
I knew it.

As as happened several times previously, the firewall requests were not 100% completed. RDP to the new boxes is OK and the software install portions worked fine. The servers can speak to the other servers so I will be able to synchronize the databases. I'll take that part as a win.

But now I need the laptops that run the administration clients to also connect to the new servers over dedicated ports to complete the full set-up ... and they don't.

The set-up is back to stalled - SIGH!
 

DarkWeb

Well-Known Member
I knew it.

As as happened several times previously, the firewall requests were not 100% completed. RDP to the new boxes is OK and the software install portions worked fine. The servers can speak to the other servers so I will be able to synchronize the databases. I'll take that part as a win.

But now I need the laptops that run the administration clients to also connect to the new servers over dedicated ports to complete the full set-up ... and they don't.

The set-up is back to stalled - SIGH!
Smoke break!
 

manfredo

Well-Known Member
I think manfredo is gonna make him do manual labor. I would choose sitting at my desk to hide from him. He probably threatens the poor guy with those foxes he is training...
I wish....He has taken over my TV





Loooong line at the landfill. NEVER seen it like this. Must be everyone is cleaning up for the holiday weekend.

1685119951701.png

And I got my new composter....It looks pretty big! $45 there. Amazon was $199 for same brand. Some kind of deal from the county to promote recycling/composting.



OK, gotta go sort clones for 2 friends coming over....and by sort, I mean pick out the best for myself !!
 
Top