firsttimeARE
Well-Known Member
I was fucked once. Had to tear down every-fucking-thing and hide it in the back of the actual room.
They have to take photos of every room. Not sure but I think I had a couple 4by4 tents up that I could do nothing to hide but they were dark.
Yeah imma wait until everythings done. Probably another 6 weeks everything will be dried and chopped.
Then its rdwc and a new lighting system in flower room, possibly COB. Id switch now but money is tight right now and we are trying to do floors.