Did these shelves last week, including boxing in space at top of step. Needed a 2×4 to anchor shelves, wound up boxing it in...
so...was going to box in opposite side, but then decided to make a shelf at the top step. Don't ask me for what...we get blasted and put things together all day...maybe a good spot for bug spray or something.
On the other side of steps I was poking around and realized there were like 30 exposed brad nails from putting up paneling on back door landing wall...WTF?...missed those so put up a plywood cover and made yet another shelf. Not pretty but functional...nobody ever goes there anyway...but you can't have sharp nail ends sticking out in a low light area.
Painted this raised concrete block on floor, directly under steps and directly under back door. I have no idea what it was for...but the original part of house was 1939 construction so maybe something to do with a coal furnace many decades ago?
I have high hopes of being done in early October. It's fun but I need a break...we started Jan. 15th.
A real rebuilding year.