DCcan
Well-Known Member
I need a vacation.
Finished up a 2 week job at the undersea cable factory, I can still hear the pulleys and miles of cable in my sleep.
It dwarfs the enormous sheet rock plant up the river on the right. That's up next month for some work, only 2 days.
(Just some stock photos, Navy had some sneaky smart cable being moved.)
Regular fiber cable getting ready for a dip in hot tar bath before being wrapped in armor wire, spliced into amplifiers and repeaters, spooled onto ships from a creel warehouse. Quite an unusual manufactured product.
Finished up a 2 week job at the undersea cable factory, I can still hear the pulleys and miles of cable in my sleep.
It dwarfs the enormous sheet rock plant up the river on the right. That's up next month for some work, only 2 days.
(Just some stock photos, Navy had some sneaky smart cable being moved.)
Regular fiber cable getting ready for a dip in hot tar bath before being wrapped in armor wire, spliced into amplifiers and repeaters, spooled onto ships from a creel warehouse. Quite an unusual manufactured product.