It was a long day, but we managed. Set the lower cabinet and installed a plywood sub-top to support a stone countertop. Which someone else will manufacture. Then I can install the upper cabinet.
None of these remodel jobs are ever straight forward. Where this cabinet is set ther used to be a chase with an old water heater vent running through it from the basement. I removed the chase reframed and sheet rocked the corner prior to building the cabinets. I will probably be on this job on and off for a few years, great clients with lots of plans.
View attachment 5165769