The Growery
Active Member
It's come to the point where I have maxed out all possible available circuits in my main breaker box and need to expand. I understand how to install a subpanel, what I don't understand is where the extra power is coming from. Say I wanted to run 20k watts of equipment, that would easily trip the 100A main breaker when combined with normal electricity usage upstairs.
It looks like I will need to install a panel directly from the meter. Has anyone done this? How much did it cost and do I need to call DTE to have someone come out? Are there other options?
It looks like I will need to install a panel directly from the meter. Has anyone done this? How much did it cost and do I need to call DTE to have someone come out? Are there other options?