kk. some quick pics before i start my other journal... made some changes to the reservoir because i got sick of having to cock the lid up to drop water pumps in, and i also did not want to use styrofoam anymore because its not necessarily a permanent solution, as i would always want to just pitch it after a cycle... anyways, i got a water pump to sit in the res with a port to hook up for draining, which will also double for filling up as well... i also threw new stones and airlines as well, which i have airflow valves to connect to the airlines attached to the pump. this time however i trimmed them shorter so there will be no danger of one becoming disconnected and draining my res all over the lady who lives downstairs lol... i dont know if there is a quick connect made that will stop flow if the other is not connected but im gonna look into it. im pretty sure there is because ive used something of the sort when i worked in manufacturing. anyways, i also hooked up my new 600w, and redid the ventilation. everything is looking pretty good, and im ready to go. vegging plants are doing great, fimmed them a lot but apparently i might have nicked some baby fan leaves because some spots where i fimmed the tips are not on the leaves lol. either way, they are growing well and bushy. heres some pics
just gotta hit the grow store now to grab some panda film for the top. shit was easy to set up this reservoir, only needed a paddle bit and a jig saw for the most part. i think im very close to the perfect res for my stuff... anyone has any questions feel free to ask...