What did you accomplish today?

shrxhky420

Well-Known Member
That was for just the cabinets, getting quartz once the cabinets are in. I opted for wood cabinets so it was 20% higher. I'm figuring out the install once they get here. They say 3 months minimum till they are delivered. There are 5 wall cabinets, but they are 42" tall.
Haha! You said wood.
Went wood as well but did not go with the taller cabinets. May have been easier with some of the cabinets I installed. Never crossed my mind. Next time... hopefully no next time though

SH420
 

TerryTeacosy

Well-Known Member
New 6mx3m greenhouse is finally taking shape today:


DSCN3079.JPG



Next jobs are:

1. Get pond liner down underneath it.
2. Run string lines to square-up the frame & anchor it down with saddles & tent pegs.
3. Collect some free concrete pavers from a local bloke to create a floor.
4. Run a double-line of bricks around the outside to hold-down the excess shell.
5. Install plastic pallets for free-drainage.
6. Design & construct a low-pressure, timer-controlled watering system from IBC's raised on a stack of pallets.
7. Find a cure for cancer & PTSD.
8. Mow the fucking grass!

Should only take me a few more hours.........
 

JonathanT

Well-Known Member
A before and during pic of the living room downstairs in the hoard house we purchased. So far the house is 90% done, new plumbing, bathroom, new flooring going down in the few rooms that I'm not going down to the 1800s hardwood, new hot water heater, 4 out of the 7 outbuildings are cleaned out. Getting close. The barn was a massive task. It is 60W X 100L X 50H and built in 1920 but it has to come down sadly. 20211030_112513.jpg20211128_151001.jpg
 
Top